Tasuta kohaletoimetamine tellimustele üle 29 €
  • check 10+ miljonit raamatut
  • check Uued tooted iga päev
  • check Meid usaldab üle 1 miljoni kliendi
  • check Hea hind ja allahindlused
  • check Tarne üle kogu Euroopa

Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and IT Solution - Khalid S. Al-Gahtani

inglise keel
2010-12-13
79,59 € 113,70 €

-30% koodiga BOOKS

Meie tarnija laos

Saadetis 12-18 tööpäeva jooksul

30-päevane tagastamisõigus

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool ... Täielik kirjeldus

Võib-olla meeldib sulle ka

Kirjeldus

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.

Lisateave

Autor Khalid S. Al-Gahtani
Kirjastaja LAP LAMBERT Academic Publishing
Väljalaskeaasta 2010
Kaanetüüp Pehme kaanega
EAN 9783843350709
Kirjuta oma arvustus
Te vaatate: Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and IT Solution
Teie hinnang:

Goodreads'i arvustused

79,59 € 113,70 €