Construction Scheduling, Cost Optimization and Management - Hojjat Adeli,Asim Karim
-40% koodiga BOOKS
Saadetis 15-21 tööpäeva jooksul
30-päevane tagastamisõigus
This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.
Võib-olla meeldib sulle ka
Kirjeldus
This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.
Lisateave
| Autor | Hojjat Adeli, Asim Karim |
|---|---|
| Kirjastaja | CRC Press |
| Väljalaskeaasta | 2019 |
| Kaanetüüp | Pehme kaanega |
| EAN | 9780367863807 |