Tasuta kohaletoimetamine tellimustele üle 29 €
  • check 10+ miljonit raamatut
  • check Uued tooted iga päev
  • check Meid usaldab üle 1 miljoni kliendi
  • check Hea hind ja allahindlused
  • check Tarne üle kogu Euroopa

Measuring Time: Improving Project Performance Using Earned Value Management - Mario Vanhoucke

inglise keel
2009-12-17
124,20 € 207,00 €

-40% koodiga BOOKS

Meie tarnija laos

Saadetis 22-28 tööpäeva jooksul

30-päevane tagastamisõigus

Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project's time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions d ... Täielik kirjeldus

Võib-olla meeldib sulle ka

Kirjeldus

Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project's time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions decision-making process during project tracking. As readers apply what is learned from the book, EVM practices will become even more effective in project management and cost engineering. Individual chapters look at simulation studies in forecast accuracy; schedule adherence; time sensitivity; activity sensitivity; and using top-down or bottom-up project tracking. Vanhoucke also offers an actual real-life case study, a tutorial on the use of ProTrack software (newly developed based on his research) in EVM, and conclusions on the relative effectiveness for each technique presented.

Lisateave

Autor Mario Vanhoucke
Kirjastaja Springer Us
Väljalaskeaasta 2009
Kaanetüüp Kõvakaaneline
EAN 9781441910134
Kirjuta oma arvustus
Te vaatate: Measuring Time: Improving Project Performance Using Earned Value Management
Teie hinnang:

Goodreads'i arvustused

124,20 € 207,00 €