Productivity Improvement through Time Study Analysis: Practical Implementation - Ali Akbar Jaffery,Muhammad Jahanzaib,Muhammad Umair Akbar
-30% koodiga BOOKS
Saadetis 12-18 tööpäeva jooksul
30-päevane tagastamisõigus
This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human f ... Täielik kirjeldus
Võib-olla meeldib sulle ka
Kirjeldus
This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human factors at the workplace.
Lisateave
| Autor | Ali Akbar Jaffery, Muhammad Jahanzaib, Muhammad Umair Akbar |
|---|---|
| Kirjastaja | LAP LAMBERT Academic Publishing |
| Väljalaskeaasta | 2018 |
| Kaanetüüp | Pehme kaanega |
| EAN | 9786134973649 |