Tasuta kohaletoimetamine tellimustele üle 29 €
  • check 10+ miljonit raamatut
  • check Uued tooted iga päev
  • check Meid usaldab üle 1 miljoni kliendi
  • check Hea hind ja allahindlused
  • check Tarne üle kogu Euroopa

Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case - Arno Sprecher

inglise keel
1994-05-27
101,63 € 169,38 €

-40% koodiga BOOKS

Meie tarnija laos

Saadetis 12-18 tööpäeva jooksul

30-päevane tagastamisõigus

Within a project human and non-human resources are pulled together in a tempo­ raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the projec ... Täielik kirjeldus

Võib-olla meeldib sulle ka

Kirjeldus

Within a project human and non-human resources are pulled together in a tempo­ raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri­ tical Path Method) were developed. Given deterministic durations and precedence­ constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta­ distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).

Lisateave

Autor Arno Sprecher
Kirjastaja Springer Berlin Heidelberg
Series Lecture Notes in Economics and Mathematical Systems
Väljalaskeaasta 1994
Kaanetüüp Pehme kaanega
EAN 9783540578345
Kirjuta oma arvustus
Te vaatate: Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case
Teie hinnang:

Goodreads'i arvustused

101,63 € 169,38 €